If you have been quoted for a chemical damp proof course (DPC), you probably want to understand what the process actually involves before committing. A chemical DPC injection is the standard modern method for treating rising damp in existing buildings, and when installed correctly with the right products, it lasts 20 to 30 years or more.
This guide explains exactly how the process works, the difference between cream and liquid injection, what happens to your walls afterwards, and how to tell whether the job has been done properly.
What Is a Chemical Damp Proof Course?
Every building needs a barrier to stop ground moisture rising up through the walls. In modern construction, this is a physical membrane (usually polyethylene) built into the wall during construction. In older buildings, the original DPC may have been slate, bitumen, or engineering brick, or it may never have been installed at all.
When the original DPC fails or is absent, rising damp develops. Ground moisture travels upward through the masonry by capillary action, causing damp walls, salt deposits, decaying plaster, and damage to timbers and decorations.
A chemical DPC creates a new moisture barrier by injecting a water-repellent chemical into the mortar course. Once cured, it forms a continuous band across the wall that stops moisture from rising any further.
DPC Cream vs Liquid Injection: What Is the Difference?
DPC Cream (Modern Standard)
DPC cream is a silicone-based thixotropic gel, typically supplied in cartridges or sausage packs. It is injected into pre-drilled holes using a low-pressure applicator. The cream stays in place after injection, then gradually diffuses through the surrounding mortar and brick as it reacts with the masonry to form a water-repellent barrier.
Cream DPC is now the industry standard because:
- It stays where it is injected and does not run out of porous or damaged mortar joints
- It works in walls of varying porosity without over-application
- It requires lower injection pressure, reducing the risk of mortar displacement
- It is effective in both brick and stone walls
Wykamol DPC cream, which we use at DampShop Services, is a BBA-certified product that meets the requirements of BS 6576 for chemical DPC installation.
Liquid DPC Injection (Older Method)
Liquid injection was the original chemical DPC method. A silicone or silane-based liquid is pumped into the wall under higher pressure. It works well in uniformly porous masonry but can be problematic in walls with voids, cracks, or mixed materials because the liquid follows the path of least resistance and may not form a continuous barrier.
Liquid injection is still used in certain situations, but cream has largely replaced it for most residential and commercial work because of its more predictable performance across different wall types.
How DPC Injection Works: Step by Step
Step 1: Survey and Diagnosis
Before any treatment, a specialist surveys the property to confirm that rising damp is genuinely present. This involves taking moisture readings with a Protimeter meter, conducting salts analysis to detect hygroscopic salts, and sometimes using carbide testing for a definitive moisture measurement. This step matters because not all damp is rising damp. Condensation, penetrating damp, and plumbing leaks can all mimic rising damp symptoms, and injecting a DPC will not fix any of those problems.
Step 2: Drilling
A series of holes is drilled into the mortar course at the correct height, typically 150mm (about 6 inches) above external ground level. For internal walls, the injection line is set at the equivalent position. The holes are spaced at regular intervals, usually around 120mm apart, and drilled to a depth that penetrates approximately two-thirds of the wall thickness. For a standard 215mm (9-inch) solid brick wall, this means holes of approximately 150mm deep.
Step 3: Injection
DPC cream is injected into each hole using a hand-operated or pneumatic applicator. The correct volume of cream is delivered into each hole to ensure the chemical diffuses through the full mortar joint and forms a continuous barrier across the wall. Under-injection leaves gaps in the barrier. Over-injection wastes product without improving performance.
Step 4: Removal of Contaminated Plaster
After injection, the salt-contaminated plaster on the internal wall face must be removed. Rising damp carries hygroscopic salts from the ground into the plaster. These salts remain even after the new DPC is in place, and they attract moisture from the air, creating ongoing damp patches that look like the treatment has failed. The contaminated plaster is hacked off to a minimum of 300mm above the visible damp line.
Step 5: Replastering
Salt-resistant renovating plaster is applied to the stripped area. This specialist plaster has a controlled porosity that resists salt migration while allowing the wall to dry. Standard gypsum plaster is not suitable because salts will migrate through it and the problem returns. This is a common cost-cutting shortcut that leads to early failure. See our guide on rising damp treatment costs for what a proper job should include.
Step 6: Drying
The new plaster needs four to six weeks to dry before you can paint or wallpaper over it. The underlying masonry below the injection line may take longer to reach equilibrium, sometimes several months depending on wall thickness and ventilation. This is normal and does not mean the treatment has failed.
How Long Does a Chemical DPC Last?
A properly installed chemical DPC using a certified product lasts 20 to 30 years or more. The chemical barrier itself does not degrade over time under normal conditions because the silicone resin bonds permanently with the masonry.
What can reduce the lifespan:
- Incorrect drilling depth or spacing, leaving gaps in the barrier
- Using an uncertified or diluted product
- Injecting into wet mortar joints without allowing adequate penetration time
- Bridging the DPC externally with raised ground levels, paving, or render applied below the injection line
- Not removing salt-contaminated plaster, so the wall appears to remain damp even though the DPC is working
When installed by an accredited contractor using a BBA-certified product, the treatment comes with an insurance-backed guarantee. At DampShop Services, our DPC installations carry guarantees of up to 20 to 30 years, backed by independent warranty providers.
Does Chemical DPC Injection Actually Work?
Yes. When the problem is genuinely rising damp and the treatment is installed correctly, chemical DPC injection is highly effective. It has been the standard remedial treatment in the UK for decades and is specified by surveyors, mortgage lenders, and insurance companies.
Scepticism about DPC injection usually stems from two situations:
Misdiagnosis. The damp was never rising damp in the first place. It was condensation, penetrating damp, or a leak. The DPC was installed correctly but could not solve a different problem.
Poor workmanship. The installation was done cheaply, with incorrect spacing, insufficient product, no plaster removal, or standard plaster instead of renovating plaster. The barrier may have gaps, or the contaminated plaster is still creating surface dampness.
This is why accurate diagnosis before treatment is critical. At DampShop Services, we use Protimeter meters, carbide testing, borescopes, and salts analysis to confirm rising damp before recommending a DPC injection.
What to Look for in a DPC Installation Quote
When comparing quotes, check that the contractor includes:
- A proper diagnostic survey with moisture readings (not just a visual inspection)
- A named, BBA-certified DPC product (such as Wykamol or Sovereign cream)
- Drilling at the correct height and spacing
- Removal of all salt-contaminated plaster
- Replastering with salt-resistant renovating plaster (not standard gypsum)
- An insurance-backed guarantee (not just a company promise)
A quote that skips the plaster removal and replastering will look significantly cheaper but is incomplete. The wall will continue to show damp symptoms from the salts left behind.
DPC Injection by DampShop Services in Swindon
- Wykamol-approved installer since 2010. We use BBA-certified Wykamol DPC cream as standard.
- Accurate diagnosis first. We confirm rising damp with Protimeter readings, carbide testing, and salts analysis before recommending treatment.
- Complete treatment. Injection, salt-contaminated plaster removal, and replastering with renovating plaster. No shortcuts.
- Insurance-backed guarantees. Up to 20 to 30 years, protected independently of our company.
- PCA registered. Property Care Association member. NEBOSH and IOSH qualified. £5 million public liability insurance.
Book a Free Damp Survey in Swindon
If you have been told your property needs a damp proof course, or you have noticed signs of rising damp on your ground-floor walls, contact us for a free survey. We will confirm the diagnosis, explain the treatment, and provide a detailed written quote.
Call 01793 238738 for a free damp survey.
Email: sales@dampshop-services.co.uk